Tuffnells Parcel Express
Depot toilet refurbishment
The work involved Cablesheer providing a design service to evaluate various depots available fully. We completed a measured survey, full feasibility with option appraisals for the client to consider. After consultation, we completed the work. The scheme was designed to consider the end user. All materials were robust to accommodate the usage required by a 24-hour depot.